| Description |

Fuse Inspection1.Be sure there is no play in the fuse holders, and that the fuses are held securely.2.Are the fuse capacities for each circuit correct?3.
InspectionOut Side Mirror Folding RelayCheck for continuity between the terminals.1.There should be continuity between the No.17 and No.16 terminals when power and ground are connected to the No.
S
High Voltage Shut-off Procedures • Be sure to read and follow the "General Safety Information and Caution" before doing any work related with the high voltage system. Failure to follow the safety instructions may result in serious electrical injuries.